We've started our 2010 summer house project. We're going to level the floor of our basement. This is the first step toward improving the basement to livable space. So far we've been doing preliminary work:
- chip away delaminated sealant from the concrete walls
- clean up exposed concrete to receive new concrete filler and a fresh coat of sealant
- survey (elevation measurements) the concrete floor
- check the floor drain to be sure it actually works (it does)
The long-term plan is to frame in the laundery area, insulate and sheetrock the walls, carpet the floor and stairs, create an egress window, and move the playroom downstairs. Before any of the other can be done (except the egress window) the floor has to be ready. And so it begins.
*Pictures to come.
good luck!!!!!